0.14 release schedule

John Arbash Meinel john at arbash-meinel.com
Thu Jan 4 16:30:49 GMT 2007


-----BEGIN PGP SIGNED MESSAGE-----
Hash: SHA1

Wouter van Heyst wrote:
> Hi all,
> 
> my release management duties have slipped a bit, sorry about that :/
> 
> 
> If we feature freeze next monday, a standard two week period of bugfixes
> and stabilisation buffer will give us a 0.14 final on January the 22th,
> 8 weeks after bzr.dev opened again.
> 
> Since there were no commits to bzr.dev between December the 22th and
> January the 2nd, perhaps we could make do with a slightly shorter
> buffer, but in my opinion it will not win us much. If people have some
> (big) features in mind they need a bit more time for, please speak up.
> 
> Otherwise I propose to go with the following schedule:
> 
>     January  8th, 0.14 feature freeze
>     January 15th, 0.14rc1, bzr.dev reopened for 0.15
>     January 22th, 0.14 final
> 
> Wouter van Heyst

While the schedule probably slipped a bit, I know I was on vacation for
the last week and a half, as were most of the rest of us.

And since it isn't really possible to freeze in retrospect, we might as
well go with this schedule. +1 from me.

John
=:->

-----BEGIN PGP SIGNATURE-----
Version: GnuPG v1.4.3 (GNU/Linux)
Comment: Using GnuPG with Mozilla - http://enigmail.mozdev.org

iD8DBQFFnSu5JdeBCYSNAAMRAvFPAKCXL+k3AgxdL7QUA1hjtXosK2IsBACgkNRX
TZTVjS17nrvZj5gqn00fBDw=
=xZSJ
-----END PGP SIGNATURE-----



More information about the bazaar mailing list