br-1.15final on May 22, 2009?

Bob Tanner tanner at real-time.com
Sat May 16 16:25:42 BST 2009


On 2009-05-16 08:18:54 -0500, John Arbash Meinel <john at arbash-meinel.com> said:

> That is the general plan. Sounds good.
> 
> So what is the timeframe for 1.16?

I believe jml would like to be the RM on 1.16?

Archived-At:	<http://permalink.gmane.org/gmane.comp.version-control.bazaar-ng.general/56297>


-- 


Bob Tanner <tanner at real-time.com>                  | Phone : (952 943-8700
http://www.real-time.com, Linux, OSX, VMware | Fax   : (952)943-8500
Key fingerprint = F785 DDFC CF94 7CE8 AA87 3A9D 3895 26F1 0DDB E378





More information about the bazaar mailing list